Our Construction Process, From First Call to Final Inspection
Every project is different, but the order of the work is not. This is how a ground-up build runs with RO Unlimited in Upstate South Carolina and Northeast Georgia. Smaller jobs skip the steps they do not need.
First Call & Site Visit
It starts with a call or a message through the contact page. We ask what you want to build, where, and when, then look at the property and whatever drawings exist.
- Send plans, a survey or just the address
- We walk the site with you
- You hear plainly what the job will take
Scope & Written Estimate
We put the scope in writing: what is included, what is not, and what it costs. If the design is not finished, we tell you which numbers are firm and which depend on drawings still to come.
- Scope written out by trade
- Allowances and exclusions called out
- Questions answered before you sign
Contract, Permits & Planning
Once you approve the estimate, the contract is signed and the permits are applied for under our own license numbers. Long-lead materials are ordered and the work is sequenced.
- Building, land disturbance and utility permits
- Utility locates called in
- Materials ordered and trades lined up
Site Work & Utilities
Erosion controls go in, the land is cleared and graded, the pad is built, and storm drainage, water and sewer are installed while the site is open.
- Clearing, grading and building pad
- Storm, water and sewer in the ground
- Inspections passed before backfill
Foundation & Structure
Footings and slab are poured, then the structure goes up: framing, steel or a mix of both, built to the approved drawings.
- Footing and slab inspections
- Framing or steel erection
- Structural inspection before cover-up
Dry-In & Building Systems
Roofing and exterior skin close the building in. Plumbing, electrical and HVAC rough-ins follow under our mechanical contractor license, each inspected before the walls are closed.
- Roof and exterior envelope
- Plumbing, electrical and HVAC rough-in
- Rough-in inspections
Interior & Finishes
Insulation, drywall, flooring, trim, fixtures and paint. Outside, the drives, parking and final grading are finished and the site is stabilized.
- Interior build-out and finishes
- Paving, concrete flatwork and final grade
- Trim-out of every building system
Final Inspection & Walkthrough
The building official does the final inspection. Then we walk the project with you, write the punch list, finish it, and hand over the building.
- Final inspections and certificate of occupancy
- Punch list written with you and completed
- Keys, warranties and closeout documents
What We Need From You to Start
The Property
The address or parcel, and a survey if you have one.
The Plans
Architectural or civil drawings at whatever stage they are in. No plans yet is fine too.
The Timeline
When you want to break ground and any date the building has to be open by.
Permits, Inspections and Accountability
One License Holder
Site, utilities, building and mechanical work are permitted under RO Unlimited’s own state license classifications, in South Carolina and Georgia.
Inspected at Every Stage
Work is inspected by the local building department before it is covered, and nothing gets buried or closed in until it has passed.
You Know Where It Stands
You get straight updates as the job moves, and changes to scope or price are put in writing before the work is done.