Hot tap machine bolted to a gate valve and tapping sleeve on a live water main inside a shored trench
Serving Greenville, SC

Underground Utility Contractor
Serving Greenville, SC

Water lines, sanitary sewer, storm drainage and service connections for commercial sites and developments in Greenville and Greenville County. RO Unlimited is licensed in South Carolina for water and sewer lines. In Greenville that means building for three different owners of the pipe.

Underground Utilities in Greenville

Pipe in the Ground in Greenville

01

Greenville Water makes its own taps

Greenville Water serves more than 750,000 residents across Greenville County and parts of Anderson, Pickens and Laurens counties, drawing from Table Rock Reservoir, North Saluda Reservoir and Lake Keowee.

One rule sets it apart from many utilities: Greenville Water taps or makes the connections to all of its water mains itself. The contractor's part is the excavation, shoring and access so its crew can do the tap, then everything downstream of it. Scheduling that crew is a critical-path item, and we request it as soon as the permit is in hand.

02

How a water main extension is approved

A new main goes through Greenville Water's New Development Project Review, run by Development Services in its Engineering Department. Your engineer submits the package, Development Services reviews and redlines it, and the SCDES construction permit application follows.

In the field, a pre-construction walkthrough must be requested at least 72 hours before construction begins. Greenville Water inspects all new water main installations and coordinates the pressure testing and sampling. Closeout requires as-built drawings, a coordinate-correct AutoCAD file and a deed exhibit before SCDES issues final approval to operate.

03

Sewer: who collects and who treats

Sewer in Greenville has two layers. ReWa conveys and treats, with nine water resource recovery facilities. The pipe your building connects to belongs to a collection agency: the City of Greenville's Sanitary Sewer Bureau, which runs about 327 miles of collection system, or MetroConnects, the Metropolitan Sewer Subdistrict, in much of the county.

MetroConnects permits all new sewer construction that will be dedicated to it, and says plainly that any tap or connection to its lines or manholes without a permit is an illegal tap. The city reviews sewer main extension plans itself under the state's Delegated Review Program.

04

ReWa capacity is a two-step approval

Before new flow is accepted, ReWa runs a two-step process: a Preliminary Capacity Request, then Capacity Approval. A fee is due with each complete plan submittal before its engineers review it.

The second step cannot be filed on your own. It needs a letter from the collection agency endorsing the project and agreeing to own and operate the new sewer, plus the signed SCDES construction permit application. When it is approved, ReWa issues a flow acceptance letter. A missing letter from one agency holds up the other, so we track both as one item.

Permits, Taps and Inspections

Who Signs Off in Greenville

Water

Greenville Water, Development Services

New Development Project Review for main extensions; makes all taps; 72-hour notice for the pre-construction walkthrough.

Sewer treatment

ReWa (Renewable Water Resources)

Two-step capacity process ending in a flow acceptance letter.

Sewer collection, county

MetroConnects (Metropolitan Sewer Subdistrict)

Permits all new sewer to be dedicated to it. A tap without a permit is an illegal tap.

Sewer collection, city

City of Greenville Sanitary Sewer Bureau

About 327 miles of collection system. Sewer capacity request required for new development and redevelopment.

State permit

SCDES (formerly DHEC)

Construction permit for water and sewer extensions, and final approval to operate.

Agency names and requirements are taken from each agency's own published pages. They change, so the permit path for your parcel is confirmed with the agency before we price it.

From Our Jobs

The Work, Up Close

Hot tap machine bolted to a gate valve and tapping sleeve on a live water main inside a shored trench
Hot tap on a live main, inside a trench box.
Stainless steel tapping sleeve and blue tapping valve bolted onto a water main in a wet excavation
Stainless tapping sleeve and valve on the main.
White PVC sewer lateral with a wye and cleanout riser laid in a red clay trench
Sewer lateral, wye and cleanout in red clay.
Greenville Questions

Asked Before the Bid

Can a contractor tap a Greenville Water main?

No. Greenville Water states that it taps or makes connections to all of its water mains. Typically the contractor performs the excavation so the utility's crew can make the tap, then installs the line from there.

Who do I apply to for a sewer connection in Greenville?

Two agencies. The collection agency for your address, the City of Greenville or MetroConnects, permits the connection to its pipe, and ReWa approves the capacity through its two-step process and issues a flow acceptance letter.

How much notice does Greenville Water need before construction?

Its new development process calls for a pre-construction walkthrough to be requested a minimum of 72 hours before construction begins. Greenville Water then inspects the installation and coordinates pressure testing and sampling.

Is RO licensed for water and sewer line work in South Carolina?

Yes. Water and sewer lines is one of the 13 South Carolina license classifications RO Unlimited holds. The license numbers and the state lookup link are on our licenses page.

Building in Greenville?

Send Us
Your Plans

Send the utility sheets or the address of your Greenville site. We will tell you who owns the water and the sewer in front of it and what each will require.

(864) 304-0139