
Underground Utility Contractor
Serving Anderson, SC
Water lines, sanitary sewer, force mains, storm drainage and service connections for commercial sites in Anderson and Anderson County. RO Unlimited is licensed in South Carolina for water and sewer lines. In Anderson County the first job is working out which of many systems the pipe will belong to.
Pipe in the Ground in Anderson
A wholesaler and its members
Anderson's water starts at Lake Hartwell. The Anderson Regional Joint Water System, a partnership of rural and municipal water districts, runs the Lake Hartwell Water Treatment Plant, which it bought from Duke Energy in 2002, and sells treated water wholesale across Anderson and Pickens counties.
The pipe in front of your site belongs to a member, not to the joint system. The members include the City of Anderson, Big Creek, Broadway, Hammond, Homeland Park, Powdersville Water, Sandy Springs, Starr-Iva and West Anderson, as well as the towns of Pendleton and Williamston. Each one sets its own standards for a tap or an extension.
Inside the city: Electric City Utilities
Electric City Utilities is the City of Anderson's division for water distribution, wastewater collection and wastewater treatment. It has about 15,800 service connections across 31 square miles.
On the sewer side the city operates two treatment plants, Rocky River at 9.5 million gallons a day and Generostee at 10 million, fed by roughly 280 miles of gravity line and five pump stations. The city publishes a standard specification for gravity and force main sewer construction and a checklist for the state Delegated Review Program, and that is what its inspectors hold the work to.
County sewer: collection and transport
Anderson County Wastewater serves residential, commercial and industrial customers with about 250 miles of collection lines and 43 pump stations. With that many pump stations, a new connection often means a force main or a station upgrade, not just a gravity lateral.
The county's rules are short and firm. A permit must be completed before connecting. A capacity fee applies to every permit. Any connection to the county system must be inspected by county wastewater personnel, and inspections need 48 hours' notice. It also provides a flow request form, which is where a commercial project should start.
Trenching here
Piedmont clay of the Cecil type, which the USDA describes as red clay over saprolite on the uplands, generally digs cleanly and stands well when it is dry. It should never be trusted to. Every trench a person enters is sloped, benched or shielded, and the hot tap photo on this page shows the trench box we work inside.
Near Lake Hartwell and along the creeks, groundwater changes the job: dewatering, stone bedding and a slower pace. We look at the creek crossings and low points on the utility plan first, because that is where the time goes.
Who Signs Off in Anderson
Anderson Regional Joint Water System
Lake Hartwell Water Treatment Plant; wholesale supplier to member utilities in Anderson and Pickens counties.
Electric City Utilities (City of Anderson)
About 15,800 connections. Rocky River and Generostee treatment plants. Publishes its own sewer construction specification.
Anderson County Wastewater
About 250 miles of line and 43 pump stations. Permit, capacity fee and inspection required for every connection.
SCDES (formerly DHEC)
Construction permits for water and sewer extensions, including the Delegated Review Program.
Agency names and requirements are taken from each agency's own published pages. They change, so the permit path for your parcel is confirmed with the agency before we price it.
The Work, Up Close



Licensed for the underground
Water and sewer lines is its own South Carolina license classification. RO holds it, along with grading, boring and concrete, so the trench, the pipe and the restoration are under one license holder.
Grading
Clearing and grubbing, mass excavation, embankment, building pads, site balancing and finish grading.
Water & Sewer Lines
Water mains, taps and services, sanitary sewer, storm drainage, force mains and lift stations.
Concrete
Footings, foundations, structural slabs, walls, curb and gutter, sidewalks and concrete paving.
Boring & Tunneling
Directional boring, jack-and-bore casings and tunneling under roads, rail and structures that can’t be cut.
Asked Before the Bid
Is Anderson Regional Joint Water System my water provider?
Not directly. It is the wholesale supplier that treats Lake Hartwell water. Your account and your tap are with one of its member utilities, such as Electric City Utilities in the City of Anderson, or the Hammond, Sandy Springs, West Anderson, Big Creek or Powdersville water districts.
Does Electric City Utilities provide electricity?
No. Electric City is Anderson's nickname. Electric City Utilities is the City of Anderson's water and wastewater division, responsible for water distribution, wastewater collection and wastewater treatment.
What does Anderson County require for a sewer connection?
A permit completed before connecting, a capacity fee based on the SCDES unit contributory loading rate, and inspection of the connection by Anderson County Wastewater personnel, scheduled with 48 hours' notice.
Is RO licensed to install water and sewer lines in Anderson?
Yes. RO Unlimited holds the South Carolina water and sewer lines license classification, which applies statewide. Each utility's own contractor requirements are confirmed before the bid.
More From RO Unlimited
Underground Utilities in nearby towns
Send Us
Your Plans
Send the utility sheets or the address of your Anderson site. We will work out whose water and whose sewer it is and what each system will require.
(864) 304-0139