Underground Utility Contractor
Serving Spartanburg, SC
Water lines, main taps, sanitary sewer and storm drainage for commercial sites and developments in Spartanburg and Spartanburg County. RO Unlimited is licensed in South Carolina for water and sewer lines, and builds to the specifications of whichever utility will own the pipe when the job is done.
Pipe in the Ground in Spartanburg
One name, two utilities
Spartanburg Water is two legal entities operating under one name: the Spartanburg Water System, which supplies drinking water, and the Spartanburg Sanitary Sewer District. Water comes from three interconnected reservoirs, Municipal Reservoir #1, Lake Bowen and Lake Blalock, and the service area covers roughly 864 square miles of retail and wholesale territory.
On the sewer side the district operates nine wastewater treatment facilities, from Fingerville and Chesnee to Pacolet and the South Tyger River. Which plant your flow ends up at is the district's call, and it is one of the first things that decides whether a connection is simple.
How an extension gets approved
Spartanburg Water's Engineering Department handles developer work. For a water extension it offers distribution system design at no charge, and says an uncomplicated subdivision or commercial layout can be completed in 45 to 60 days from receipt of the electronic plat. You may also hire your own South Carolina engineer.
Permitting runs through the SCDES Delegated Review Program, with Spartanburg Water doing the review. Its Developers' Manual requires that all water and sewer construction be done by a utility contractor licensed in South Carolina and approved by Spartanburg Water. That approval is settled before the bid, not assumed.
What the field process demands
A pre-construction conference with the utility's engineer is required at least 72 hours before work begins. A Spartanburg Water field technician must be present for all testing, and the lines have to pass every applicable test: air, deflection, hydrostatic, vacuum and bacteriological.
Taps are not released until record drawings are submitted and approved, with an electronic copy in DWG format on the State Plane coordinate system. After final acceptance the facilities become the property of Spartanburg Water, and the contractor remains responsible for repairs for one year. We keep as-built measurements as the pipe goes in, because rebuilding them from memory is how closeout stalls.
Outside Spartanburg Water territory
Not every site in the county is theirs. The SJWD Water District has served western Spartanburg County since 1956, starting with the mill towns of Startex, Jackson, Wellford and Duncan. It has its own standard construction specifications and wants its pre-construction conference at least 48 hours ahead.
The Liberty-Chesnee-Fingerville Water District serves the northeast part of the county. Two districts can meet along one road, each with its own details for the same fitting, so the first thing we establish on a county site is whose main is in front of it.
Who Signs Off in Spartanburg
Spartanburg Water System
Three reservoirs, about 864 square miles of service area. Engineering Department reviews extensions; free design service for water.
Spartanburg Sanitary Sewer District
Nine wastewater treatment facilities. Extensions follow the district technical specifications and the delegated review process.
SJWD Water District
Own standard specifications; pre-construction conference at least 48 hours before work starts.
SCDES (formerly DHEC)
Water and sewer construction permits, issued here through the Delegated Review Program.
Agency names and requirements are taken from each agency's own published pages. They change, so the permit path for your parcel is confirmed with the agency before we price it.
The Work, Up Close



Licensed for the underground
Water and sewer lines is its own South Carolina license classification. RO holds it, along with grading, boring and concrete, so the trench, the pipe and the restoration are under one license holder.
Grading
Clearing and grubbing, mass excavation, embankment, building pads, site balancing and finish grading.
Water & Sewer Lines
Water mains, taps and services, sanitary sewer, storm drainage, force mains and lift stations.
Concrete
Footings, foundations, structural slabs, walls, curb and gutter, sidewalks and concrete paving.
Boring & Tunneling
Directional boring, jack-and-bore casings and tunneling under roads, rail and structures that can’t be cut.
Asked Before the Bid
Who provides water and sewer in Spartanburg?
In the city and much of the county, Spartanburg Water, which is the Spartanburg Water System and the Spartanburg Sanitary Sewer District under one name. Western Spartanburg County is served for water by SJWD, and the northeast by the Liberty-Chesnee-Fingerville Water District.
Can any contractor install a water line for Spartanburg Water?
No. Spartanburg Water's Developers' Manual requires that water and sewer construction be completed by utility contractors licensed in South Carolina and approved by Spartanburg Water. RO holds the South Carolina water and sewer lines classification; approval for a given project is arranged with the utility before work starts.
How long does Spartanburg Water take to design a water extension?
Spartanburg Water says an uncomplicated subdivision or commercial layout can be completed within 45 to 60 days of receiving the electronic plat, and it provides that design service free of charge. Review and permitting follow through the SCDES Delegated Review Program.
What has to happen before Spartanburg Water releases taps?
The lines must pass all applicable tests with a Spartanburg Water technician present, and record drawings must be submitted and approved, including an electronic copy in DWG format on the State Plane coordinate system.