Commercial General Contractor
Serving Easley, SC
RO Unlimited is a licensed general contractor serving Easley and Pickens County: ground-up commercial buildings, shells, build-outs and the site and utility work that goes with them. In Easley, sewer capacity and city limits decide what can be built before anyone draws a floor plan.
Building in Easley
One utility for power, water and sewer
Easley Combined Utilities is municipally owned and governed by a three-member Commission of Public Works. It supplies electric, water and wastewater service, so a building in its territory has one utility to deal with for all three.
Its water comes from Saluda Lake, a 330-acre impoundment of the Saluda River, through an 18 million gallon a day treatment plant. Power is supplied through the Piedmont Municipal Power Agency. The utility publishes standard water and sewer specifications, and those govern any line that will be turned over to it.
Sewer service is tied to annexation
This is the rule that surprises owners. Under the Easley Combined Utilities sewer service policy effective February 10, 2025, the utility will not hold capacity for a development until capacity fees are paid in full. A property contiguous to the city must attempt annexation before sewer service is approved.
In the Middle Branch basin the rule is stricter: the property must be annexed into the City of Easley first, and the policy describes the Middle Branch treatment plant as reaching its rated capacity. The developer is also required to complete any off-site improvements needed to serve the parcel. Check the basin before you close on the land.
City permits, county permits and impact fees
Inside the city, the Building Department on North 1st Street reviews plans, issues permits and inspects. Commercial plans are submitted as two stamped hard copies. Planning and Development administers the city's Unified Development Ordinance, last updated in April 2026, and the city has charged development impact fees at the full rate since January 2024.
Outside the city limits the permit comes from Pickens County Building Codes Administration through its online self-service portal. Both enforce the 2021 building codes, and the 2024 codes take effect on January 1, 2027.
Site rules start at a quarter acre
Pickens County regulates smaller sites than the state does. Land disturbance of a quarter acre or more needs a simplified stormwater grading permit, and one acre or more needs a full land disturbance permit with a pollution prevention plan prepared by a licensed professional. The county responds within 30 calendar days. In the city, the stormwater ordinance requires an approved sediment and erosion control plan before a building permit is granted.
New access matters here too. The SC 153 Extension, a 4.4 mile road from US 123 to Saluda Dam Road, opened in December 2020, and the Department of Transportation said it would open new opportunities for economic development in the Easley area.
Who Signs Off in Easley
Easley Combined Utilities
Municipal utility. Sewer capacity is not held until fees are paid; annexation rules apply by basin.
City of Easley Building Department
Plan review, permits and inspections. Commercial plans submitted as two stamped hard copies.
City of Easley Planning & Development
Unified Development Ordinance, annexation applications and zoning clearance.
Pickens County Building Codes Administration
Sites outside the city limits, through the county online self-service portal.
Pickens County Stormwater Management
Simplified grading permit at a quarter acre; land disturbance permit at one acre.
Agency names and requirements are taken from each agency's own published pages. They change, so the permit path for your parcel is confirmed with the agency before we price it.
The Work, Up Close



The licenses behind the permit
Building, concrete, masonry and grading on the general contractor license, with plumbing, electrical and HVAC on the mechanical license. One license holder accountable for the permits and the finished building.
Building
Commercial, industrial, institutional and multi-family buildings — ground-up, shells, build-outs and additions.
Grading
Clearing and grubbing, mass excavation, embankment, building pads, site balancing and finish grading.
Concrete
Footings, foundations, structural slabs, walls, curb and gutter, sidewalks and concrete paving.
Masonry
Block, brick and stone — structural masonry, veneer and retaining walls.
Plumbing
Water, drain, waste, vent and gas piping — under-slab rough-in through finish, commercial and residential.
Electrical
Services, panels, branch wiring, lighting and power for buildings and sites.
Air Conditioning
Heating, ventilation and air-conditioning systems — installation, replacement and service.
Asked Before the Bid
Do I have to annex into Easley to get sewer for a commercial building?
Often, yes. The Easley Combined Utilities sewer policy effective February 10, 2025 requires a property contiguous to the city to attempt annexation before sewer service is approved, and in the Middle Branch basin the property must be annexed first. Confirm the basin and the policy with the utility for your parcel.
Who provides electricity and water in Easley?
Easley Combined Utilities, a municipally owned utility, provides electric, water and wastewater service. Its water comes from Saluda Lake and its power supply from the Piedmont Municipal Power Agency.
How do I submit commercial plans to the City of Easley?
The city's Building Department asks for two stamped hard copies of commercial plans, mailed or delivered to its office on North 1st Street. Sites outside the city go through the Pickens County online portal instead.
What size of site needs a grading permit in Pickens County?
A quarter acre. Pickens County requires a simplified stormwater grading permit for land disturbance of one-quarter acre or more, and a land disturbance permit with a professionally prepared pollution prevention plan at one acre or more.
More From RO Unlimited
Commercial Construction in nearby towns
Send Us
Your Plans
Send the plans or the parcel. We will check the sewer basin, the city limit and the permit office before you spend money on design, then tell you what the building will take.