
Commercial General Contractor
Serving Anderson, SC
RO Unlimited is a licensed general contractor serving Anderson and Anderson County: ground-up commercial and light industrial buildings, steel shells, build-outs and renovations. From the city center to the I-85 exits, we handle the building and the ground it stands on.
Building in Anderson
Thirty miles of interstate
Anderson County's economic development office points out that the county has over 30 miles of I-85 frontage, more than any other county in the Upstate. That frontage is why industrial developers keep looking here.
At Exit 40 in Powdersville, a developer announced a 248,000 square foot Class A industrial building at Anderson Gateway Commerce Center in November 2025. Further down, county staff told the area transportation committee in 2025 that industrial traffic at Exit 27 now rivals the BMW exit. For an owner, an interstate site usually means a larger pad, heavier pavement and a longer utility run than a site in town.
City permits and county permits are both online
Inside the City of Anderson, the Building and Codes Department on South Main Street takes all plan review and permit applications through the city's online portal. The city prices commercial plan review at half the cost of the building permit, which is useful to know when the first budget is built.
In the unincorporated county, Anderson County Building and Codes requires every permit to be applied for online through its OpenGov portal. Both offices have enforced the 2021 International Building Code with South Carolina modifications since January 1, 2023, and the 2024 edition takes over on January 1, 2027.
Water depends on the address
The Anderson Regional Joint Water System treats Lake Hartwell water, but it is a wholesaler. A building buys its water from one of the member utilities: Electric City Utilities inside the City of Anderson, or a district such as Hammond, Sandy Springs, West Anderson, Big Creek, Broadway, Homeland Park, Starr-Iva or Powdersville Water.
Each of them has its own tap process, its own fees and its own inspector. Electric City Utilities, despite the name, is the city's water and wastewater division. We identify the provider from the parcel before pricing, because tap fees and requirements differ from one district to the next.
Sewer and site approvals
Where sewer is the county's, Anderson County Wastewater requires a permit before any connection, charges a capacity fee based on the SCDES unit contributory loading rate, and calculates that fee case by case for commercial and industrial customers. Its staff must inspect every connection, with 48 hours' notice.
On the site side, the county requires a stormwater permit at one acre of disturbance and takes up to 20 working days to review a plan. The grading permit is a separate application to a different department. Both are covered on our Anderson site work page.
Who Signs Off in Anderson
City of Anderson Building and Codes
All plan review and permit applications are submitted through the city online portal.
Anderson County Building and Codes
All permits applied for online through OpenGov. 2021 codes now; 2024 codes from January 1, 2027.
Anderson Regional Joint Water System
Treats Lake Hartwell water for its member utilities. Your retail provider is one of those members.
Electric City Utilities
The City of Anderson division for water distribution, wastewater collection and treatment.
Anderson County Wastewater
Permit before connecting, capacity fee, inspection of every connection with 48 hours notice.
Agency names and requirements are taken from each agency's own published pages. They change, so the permit path for your parcel is confirmed with the agency before we price it.
The Work, Up Close



The licenses behind the permit
Building, concrete, masonry and grading on the general contractor license, with plumbing, electrical and HVAC on the mechanical license. One license holder accountable for the permits and the finished building.
Building
Commercial, industrial, institutional and multi-family buildings — ground-up, shells, build-outs and additions.
Grading
Clearing and grubbing, mass excavation, embankment, building pads, site balancing and finish grading.
Concrete
Footings, foundations, structural slabs, walls, curb and gutter, sidewalks and concrete paving.
Masonry
Block, brick and stone — structural masonry, veneer and retaining walls.
Plumbing
Water, drain, waste, vent and gas piping — under-slab rough-in through finish, commercial and residential.
Electrical
Services, panels, branch wiring, lighting and power for buildings and sites.
Air Conditioning
Heating, ventilation and air-conditioning systems — installation, replacement and service.
Asked Before the Bid
Who supplies water to a commercial site in Anderson County?
It depends on the location. The Anderson Regional Joint Water System is the wholesale supplier, drawing from Lake Hartwell, and its member utilities sell to customers. Inside the City of Anderson that is Electric City Utilities; elsewhere it is a district such as Hammond, Sandy Springs, West Anderson, Big Creek or Powdersville Water.
How do I apply for a commercial building permit in Anderson?
Online in both cases. The City of Anderson takes plan review and permit applications through its city portal, and Anderson County requires all permits to be applied for through its OpenGov portal. RO prepares and submits the application as the licensed contractor.
Does Anderson County charge a sewer capacity fee for commercial buildings?
Yes. Anderson County Wastewater applies a capacity fee to all permits, based on the SCDES unit contributory loading rate, and asks commercial and industrial customers to call to have the fee calculated for their use.
Does RO build along I-85 in Anderson County?
We serve all of Anderson County, including the interstate exits, as part of our Upstate South Carolina service area. We do not keep an office there; we come to the site.
More From RO Unlimited
Commercial Construction in nearby towns
Send Us
Your Plans
Send the drawings or the parcel. We will tell you which Anderson office permits it, which district supplies it and what it will take to build.
(864) 304-0139