RO Unlimited is a licensed general contractor serving Greer: ground-up commercial buildings, shells, build-outs and the site and utility work under them. Greer is one city in two counties with one utility for nearly everything, and a commercial project here goes through two separate reviews.

Commercial Construction in Greer

Building in Greer

01

One city, two counties, one permit office

The City of Greer sits in both Greenville and Spartanburg counties. For a building inside the city limits, that does not change who issues the permit: it is the city's Planning & Development Department, which brings planning, permitting, plan review and inspections together.

Commercial plan review is handled through the city's eTRAKiT portal, and the architect uploads one full set of stamped drawings as a single document. The city is explicit that a permit is required before any work begins and that obtaining it is the contractor's responsibility. Zoning follows the city's Unified Development Ordinance.

02

Greer CPW is a second review, not a formality

The Greer Commission of Public Works supplies electric, natural gas, water and wastewater service. It has been the city's utility since 1914, with natural gas added in 1957.

Every commercial development project requires a Greer CPW Utility Review submission, and CPW states that this process is separate from the City of Greer's own project meetings. CPW has up to 30 days to complete its plan review. A project that goes to the city and forgets CPW finds out a month late, so we submit to both at the same time.

03

What CPW expects from the builder

CPW's Developer's Guide puts specific work on the project. The developer constructs all water and wastewater lines and services, and is responsible for all on-site excavation for commercial and three-phase electric service. Grease traps or interceptors are required for projects with kitchens and for automotive operations.

Before work starts there is a 72-hour work notice and a mandatory on-site pre-construction meeting. At the end, new water and sewer facilities carry a security equal to 15 percent of their cost, and the developer is liable for repairs for two years from acceptance. Service does not begin until SCDES issues the final permit to operate.

04

Why Greer keeps building

Inland Port Greer, off I-85 at Exit 58, opened in 2013 and gives the Upstate an overnight Norfolk Southern rail link to the Port of Charleston, 212 miles away. The South Carolina Ports Authority completed a $55 million expansion of it in 2025. BMW's plant, on Highway 101 South in Greer, employs more than 11,000 people, and Greenville-Spartanburg International Airport has a Greer address too.

The city estimates its population at about 55,000, with projected growth of five percent a year. Downtown, the Greer Station district covers roughly twelve blocks of retail, dining and professional offices. That mix produces both kinds of commercial work: new buildings near the interstate and build-outs in older ones.

Permits, Taps and Inspections

Who Signs Off in Greer

Building permit

City of Greer Planning & Development Department

Commercial plan review through eTRAKiT. Permit required before any work begins.

Power, gas, water, sewer

Greer Commission of Public Works (Greer CPW)

Utility Review required for all commercial development projects; up to 30 days for plan review.

Stormwater and grading

City of Greer Engineering, Stormwater Division

Reviews all development plans for stormwater compliance and inspects new site, road and drainage construction.

Sewer treatment

ReWa (Renewable Water Resources)

Greer CPW is one of the collection partners that send flow to ReWa.

Agency names and requirements are taken from each agency's own published pages. They change, so the permit path for your parcel is confirmed with the agency before we price it.

From Our Jobs

The Work, Up Close

Scissor lift inside a steel building frame with insulated wall panels on and the roof purlins still open to the sky
Wall insulation on, roof purlins next.
Wide concrete slab under an open steel roof frame, with insulated wall panels around the perimeter
Slab poured and frame standing, ready for roofing.
Rooftop HVAC units on a white membrane roof with yellow gas piping run across pipe supports
Rooftop units set and gas piped on a new membrane roof.
Greer Questions

Asked Before the Bid

Is a Greer building permit issued by Greenville County or Spartanburg County?

Neither, if the site is inside the city limits. The City of Greer lies in both counties, and its own Planning & Development Department issues building permits and reviews commercial plans through the eTRAKiT portal. Sites outside the city limits go to the county they are in.

What is the Greer CPW Utility Review?

It is Greer CPW's own plan review for water, sewer, electric and gas. It is required for all commercial development projects, it is separate from the city's review, and CPW allows itself up to 30 days to complete it.

Does a restaurant in Greer need a grease trap?

Yes. Greer CPW's Developer's Guide requires grease traps or interceptors for projects with kitchens, and for automotive operations as well. RO installs grease interceptors as part of its underground utility work.

Who does the trenching for commercial power in Greer?

The project does. Greer CPW's guide makes the developer responsible for all on-site excavation for three-phase and commercial electric service. On an RO job that excavation is part of the site package.